i still playing around with operate mode, does have energy_cap_max at transmission technology any impact an the results ? i does not look like that ...
energy_cap_max is not really suited for operate mode, as it limits the maximum capacity the optimization procedure can allocate to a given technology in a given location.
and the "operate" mode does not perform any optimization on the installed capacities, only the "plan" mode